Dynamic balancing for pump impeller 045-P-101A/B/C/D
Dynamic balancing for pump impeller 045-P-101A/B/C/D meets G1.0 ISO 1940 standard
Other Projects
Cleaning, welding for leak sealing of equipment E04504
Providing Area 2 hydraulic bolt tightening service - TA 2023
Repairing Boiler and auxiliary equipment - 2022
Repair and maintenance for Turbine Unit 2
Hydro Jet-cleaning heat exchanger tubes - Overall maintenance