Maintenance , overhaul turbine, generator and auxiliary equipment Unit 2
Repair, maintenance, overhaul of turbine, generator and furnace auxiliary equipment No. 2:
- Turbine repair and maintenance: Disassemble, repair, maintain, alignment, reinstall.
- Blasting by aluminum powder to clean turbine rotors and diaphragms.
- Repair and maintenance of 60MW generator.
- Repair and maintenance of Stop valve, Steam Turbine Regulating Valve system.
Other Projects
Installing bucket elevator, fans - Line 3
Maintenance, repair of steam turbine U30401A
Fabrication, installing and renovating ventilation system 11kV
Supplying materials, equipment and manpower to repair Expansion Joint CCR
Online leak sealing for 2" pipeline welds