Overhaul of Residual Heat Boiler No. 1
Thay thế các dàn ống Bộ quá nhiệt, Bộ tiết kiệm than.
Other Projects
Fabrication, installing water supply pipes across Vam Co Dong river
Heat exchanger flanges re-surfacing
Manpower, equipment supplying to perform painting and sandblasting services
Online leak repair for of reduce temperature line Furnace 1
Repairing, maintenance of dryer 32S001, 32S002