Online leak sealing at 0.75-inch water stagnant discharge line

Design, fabrication, installation of clamp for online sealing of stagnant water supply discharge line:

  • Pipe line size: 3/4"
  • Working Pressure: 9 MPa
  • Working Temperature: 200°C
  • Medium: Hot Steam
Online leak sealing at 0.75-inch water stagnant discharge line

Online leak sealing at 0.75-inch water stagnant discharge line - Cao Ngan Thermal Power Plant

Online leak sealing at 0.75-inch water stagnant discharge line

Online leak sealing at 0.75-inch water stagnant discharge line - Cao Ngan Thermal Power Plant

Online leak sealing at 0.75-inch water stagnant discharge line

Online leak sealing at 0.75-inch water stagnant discharge line - Cao Ngan Thermal Power Plant

Other Projects

Manpower supply for General maintenance TA2020

Manpower supply for General maintenance TA2020

View more
Boiler repairing

Boiler repairing

View more
Scaffolding rental for shutdown period 2021

Scaffolding rental for shutdown period 2021

View more
Overhaul of Turbine - Generator - Exciter of Unit 3

Overhaul of Turbine - Generator - Exciter of Unit 3

View more
Clean and replace catalysis blocks

Clean and replace catalysis blocks

View more
Fabrication, installing water supply pipes across Vam Co Dong river

Fabrication, installing water supply pipes across Vam Co Dong river

View more