Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Overhaul of Residual Heat Boiler No. 1
Supply of equipment, piping flange re-surfacing services
Manpower supply for General maintenance TA2020
Repair and maintenance of Circulating Fan
Fabrication, installing and renovating ventilation system 11kV