Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Supplying flange bolting services
Maintenance of pump system
Fabrication, installing water supply pipes across Vam Co Dong river
Overhaul for Turbine and Generator - Unit S1
Scaffolding rental for construction - HTTC