Repair/Overcome the vibration of Turbine Unit 1
Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.
- Adjust parameters of journal bearing 3,4.
- Repairing pillow pedestals number 3, 4.
Other Projects
Scaffolding rental for shutdown period 2021
Repair and replace GRP pipe systems
General Maintenance (DCSM)
Repair and maintenance of Feed pumps, fans
Cleaning CW heat exchangers